申请延期
因不可预见的情况需要申请项目延期本场景包含 12 句对话,2 条练习路径,帮你练熟和经理的真实交流。
对话预览
申请延期
basicI need to talk to you about the project deadline. I do not think we can realistically deliver everything by Friday as planned.
我需要跟你谈谈项目截止日期。我觉得我们实际上不太可能按计划在周五前交付所有东西。
I appreciate you flagging this early rather than waiting until the last minute. What is causing the delay?
感谢你提前说而不是等到最后一刻。是什么导致了延迟?
We discovered a compatibility issue with the legacy system that requires a significant rewrite of the integration layer. It was not something we could have predicted.
我们发现了一个和遗留系统的兼容性问题,需要对集成层做大量重写。这是我们无法预料的。
I see. How much additional time do you need? And is there any way to deliver a partial solution by Friday and the rest later?
我明白了。你需要多少额外时间?有没有办法周五先交付部分,剩下的晚些?
We can deliver the core functionality by Friday and need until next Wednesday for the full integration. I have already adjusted the sprint plan to prioritize the critical path.
我们可以周五交付核心功能,完整集成需要到下周三。我已经调整了冲刺计划来优先处理关键路径。
在职场中遇到延期,主动提出替代方案比单纯说「做不完」要专业得多。
That works for me. I will manage the client expectations on our end. Just make sure the Friday delivery is solid — no shortcuts.
我可以接受。我来管理客户那边的期望。确保周五的交付是可靠的——不要走捷径。
协商范围
intermediateThe client says the deadline is non-negotiable. We need to ship something by Friday no matter what. What can we cut to make it happen?
客户说截止日期不能商量。不管怎样我们周五必须上线。我们能砍掉什么来实现?
If the deadline is fixed, I would suggest we deprioritize the reporting module and the admin panel. Those are nice-to-haves but not critical for the user-facing launch.
如果截止日期固定,我建议我们降低报告模块和管理后台的优先级。那些是锦上添花的功能,对面向用户的发布不是必须的。
The admin panel I can live without, but the client specifically asked for reporting. Is there a lighter version we could deliver?
管理后台我可以接受没有,但报告功能是客户特别要求的。有没有一个轻量版可以交付?
Yes, we can build a basic export-to-CSV report instead of the full interactive dashboard. That would save us about two days of work and still give the client something usable.
可以,我们可以做一个基本的导出 CSV 报告,而不是完整的交互式仪表盘。这能节省我们大约两天的工作量,同时给客户一个可用的东西。
That is a smart trade-off. Let us go with that approach. Make sure to document what is deferred so we can plan it for the next sprint.
这是一个聪明的取舍。我们就用这个方案。确保记录下被推迟的内容,这样我们可以在下一个冲刺中规划。
Will do. I will create a backlog ticket for each deferred feature with clear acceptance criteria so nothing falls through the cracks.
好的。我会为每个推迟的功能创建一个待办事项,附上明确的验收标准,确保不遗漏任何东西。
关键短语
flagging this early
提前提出来
causing the delay
导致延迟
additional time
额外时间
partial solution
部分解决方案
manage expectations
管理期望
no shortcuts
不要走捷径
non-negotiable
不可商量的
what can we cut
我们能砍掉什么
I can live without
我可以接受没有
lighter version
轻量版/简化版
smart trade-off
聪明的取舍
deferred
被推迟的
文化注释
- •在职场中遇到延期,主动提出替代方案比单纯说「做不完」要专业得多。